Construction/Project Manager with OIL and Gas exp

I am a Project/Construction professional with 28 years of experience in the execution of EPC Oil and Gas,refinery,fertilizers,petrochemicals projects in India and abroad.

Responsibilities   includes administering, organizing, delivering and executing different phases of projects from engineering to commissioning.

Working as Construction Manager for EPC Projects in Alnoor.Birba,Harweel PDO stations.

Completed two major shutowns in Birba station and Al-noor  ANPS on 2016 December & 2017 Febrauary succesfully.

Manage all onsite construction functions in accordance with established policies, procedures, systems and requirements approved by the company

Function liaison between engineering, procurement and construction.

Manage project close out activities.

Responsible for constructability review during engineering phase.

Coordinate interface with operations and construction activities to identify, coordinate and mitigate risks associated with SIMOPS.

Lead a multi-disciplined construction team in the execution of the project and development and execution of the project schedule and man-hour and financial budgets.

Coordinate transition to commissioning team ensuring completion of incomplete work lists as designed and approved during MC process.

Provide input for development of construction schedules to planners and review of overall project plan, verifying adequacy of resources and allocating them as and when required.

Coordinating the HSE activities as per the company HSE policies and directives including scheduled audits, weekly, monthly meetings, TBT’s, PTW coordination meetings ect.

Review and approval of monthly progress reports. Monitor and coordinate project deliverables in order to optimize construction efficiency and cost. Ensure that any variance is addressed to and agreed with client and implemented.

Prioritize resource allocation to various activities as per the schedule, coordinating with plant and maintenance department, inform higher management about the manpower mobilization and other resource allocations requirement timely for the smooth execution of the job.

Participating and implementing and monitoring adherence to the QA policies and suggests improvements required for continuous development of Quality Management system.

Lead internal quality audits with site QA Manager and verify the adequacy of implementation of QA policies/procedures

Provide regular progress of the project through daily/weekly/monthly reports with respect to review of overall project schedule.

Anticipate and resolve problems, bottlenecks/scheduling conflicts to achieve on time/earlier deliveries to keep project on schedule.

Develop a cost report per month that details costs and expenditure for the period, forecasts the completion of the project with an aim of minimizing the variance. Manage Project indirect overhead budgets .

Monitor sub contractors performance throughout the duration of the project and ensure full records are maintained for claims/change orders executed. Chair the meetings with sub contractors and drive a proactive and inclusive approach on all issues.

Ensure any change in project schedule on the part of customer/vendor/Contractor are captured commercially and contractually.

Plan and manage all projects temporary facilities.

Worked as Project Manager in Lekhwair Greater Taliyah/LPS onplot piping replacement  projects. Involved in conceptualisation and constructability input feed back starting  from FEED stage upto commissioning with engineering and procurment team in HO and discussion with PDO regarding the issues associated.

Executed Sohar Refinery Major shutdown job successfully in March 2013

Worked as Construction manager handling EPC project for the FWKO Tank in Nimr-G projects at PDO Nimr.

Worked as site manager for Dubai Aluminum Company in Jebelali  which     involves the construction of Alumina storage silo and associated structural steel work. (EPC project)

Worked as construction manager for 770 million USD project (EPC contract) which includes construction of 88.5m dia x 22m high 2nos. of double deck condensate storage floating roof tanks and one 77m dia x 22m high floating roof tank, 44m dia 22mt high fire water dome roof tank, and foam tank with associated civil, piping, electrical and instrumentation works.

Planning methodology and execution of air rising of dome roof was done by self. Roof frames were assembled on ground inside the tank to facilitate faster completion of roof plate assembly, underneath seal welding and painting activities.

Worked as one of the contracting firms for the various projects involved in stainless steel piping and carbon steel piping and tankages jobs in Travancore titanium limited, including maintenance works.

Ensure safe and efficient execution of projects with set targets and schedules.Liaison with client senior management and troubleshooting any areas of conflict in order to ensure smooth execution and continuing working relationship.

Responsible for the inspection of all storage tanks including double wall cryogenic tanks for ethylene and propylene, horizontal sphere, BTX tank(cone roof with internal floating roof) nitrogen tank with internal diaphragm, De-mineralized water tank and other tanks.

Reviewing WPS/PQR for the project and reviewing radiographic films. Responsible for inspection of columns / vessels / exchangers / air fin coolers / demineralized skid units / pumps / compressors etc.

Also responsible for the inspection of piping for the main plant including carbon steel/stainless steel/alloy steel, piping etc.

Reviewing the procedures erection, Hydro testing, flushing, pressure testing, radiographic testing, magnetic particle testing and dye penetrant testing, oil penetrant testing of tanks and piping.

Identifying the non-conformities during the execution and resolving them.

Verifying field engineering decisions with respect to general engineering standards / specifications / code requirements.

Punch listing for final acceptance coordinating, conducting QC meeting with Contractors and sub vendors

Assigned in Head Office for reviewing bid documents and provide necessary constructability inputs required for each project at the bidding stage like resource allocation, manpower planning, histograms, rigging study of any heavy lifts , HSE requirements ect. for L&T Hydrocarbon Group. For latter part of the duration, I was responsible for the overall construction management of SRU project which was done by SIRITEC NIGI and L&T jointly.

Coordination with engineering office to resolve the outstanding issues related to construction.

Reviewing the rigging study off all columns and exchangers, progress monitoring, reviewing and reporting to the project management at Vadodara about the concerns /bottlenecks affecting the progress and take necessary actions to arrange infrastructural facilities for speedy implementation of the project.

Responsible for the erection and Hydro testing of piping and equipment for ENRON oil platform and B73 oil platform executed at L&T Hazira workshop including assembly and testing of cranes.

Responsible for the fabrication and erection of storage tanks (4nos.) & desalination unit Evaporator associated erection & welding of piping and Evaporator including Cu-Ni, Cu-Ni clad, carbon steel and stainless steel piping, brine recirculation pumps. Ejectors etc.Coordination with construction contractor and progress monitoring.

Inspection of degasser tanks, vertical pumps, Desalter  trains, process pumps, desalination unit, package boiler, plate heat  exchangers, flare stack, fin fan coolers, oily water Separator and associated piping at Safaniya GOSP of SAUDI ARAMCO

Responsible for the erection of equipments and storage tanks including dome roof tank D.M. Water tank of 60000cu.m.capacity,fuel oil tank, Overhead cranes, Sea water screening units/Gates, Lime conveyors, Evaporator chemical skids, Chlorination units etc. including piping in evaporator  unit. (Cu-Ni, Cu-Ni clad piping)

Rigging study for the heavy lifts and sea water intake pump assembly was also done by me.

Erection & supervision of 2 biogas storage tanks, parallel plate separators, plate heat exchangers and associated piping works at Gajruala plant. Responsibilities include evaluation of the contractor bids, Laisoning with contractors, progress monitoring, invoicing etc.

 

Last Resume Update September 17, 2018
Address Aluva, India
E-mail Locked
Phone Number Locked

Experience

The Oman Construction Company
Construction Manager
Aug 2014 - Jan 2015

From September 2014 to January 2015 I was working for TOCO for various well head piping/Flowline works in Wadi liatham and Safah for OXY.

Galfar Engineering and Construction SAOG
Construction Manager/Project Manager
May 2012 - Apr 2014

Worked as Project Manager in Lekhwair Greater Taliyah/LPS onplot piping replacement projects. Involved in conceptualisation and constructability input feed back starting from FEED stage upto commissioning with engineering and procurment team in HO and discussion with PDO regarding the issues associated.

Executed Sohar Refinery Major shutdown job successfully in March 2013

Worked as Construction manager handling EPC project for the FWKO Tank in Nimr-G projects at PDO Nimr.

Cleveland Bridge Engineering and Construction Pvt Ltd
Site Manager
May 2010 - Jul 2011

Working as site manager for Dubai Aluminum Company in Jebelali which involves the construction of Alumina storage silo and associated structural steel work. (EPC project

Qatar Engineering and Construction LLC
Construction Manager
Jan 2008 - Jan 2010

Worked as construction manager for 770 million USD project (EPC contract) which includes construction of 88.5m dia x 22m high 2nos. of double deck condensate storage floating roof tanks and one 77m dia x 22m high floating roof tank, 44m dia 22mt high fire water dome roof tank, and foam tank with associated civil, piping, electrical and instrumentation works.

Planning methodology and execution of air rising of dome roof was done by self. Roof frames were assembled on ground inside the tank to facilitate faster completion of roof plate assembly, underneath seal welding and painting activities.

Padma Tanks and Vessels
Project Manager
Feb 2001 - Dec 2007

Worked as one of the contracting firms for the various projects involved in stainless steel piping and carbon steel piping and tankages jobs in Travancore titanium limited, including maintenance works.

Ensure safe and efficient execution of projects with set targets and schedules.

Liaison with client senior management and troubleshooting any areas of conflict in order to ensure smooth execution and continuing working relationship.

Education

College of Engiineering,Thiruvananthapuram
Bachelor of Techonology(Mechanical)
Sep 1980 - Oct 1985

Passed with first class(61$)

Kerala University
Pre-degree
Jun 1978 - Apr 1980

Passed with 82% marks

Govt.Model.H.S.,Thiruvananthapuram
SSLC
Jun 1977 - Apr 1978

Passed with first class(74%)

Contact Candidate

Login or register as Employer to contact this candidate.