Mechanical Engineer

*KHALID A.AL-MULHIM & BROS.CO.LTD. (KAMCO) DAMMAM,KSA
1. PROJECT : RABIGH II B4 PROJECT (U01)
End User : ARAMCO
Position : 2 Years work as Site Mechanical Engineer & late 2 Year work as QC Engineer
Period : May.2013 to March. 2017
2. PROJECT : IBN RUSHED PROJECT-IR-2-YANBU
End User : SABIC
Position : QA/QC LEAD (Mechanical) / Site Engineer - Mechanical
Period : OCT.2011 to May.2013.
3. PROJECT : CBRM PROJECT RAJHI STEEL INDUSTRIES - JEDDAH.
End User : DANIELI
Position : Mechanical Site Engineer /QC Engineer
Period : OCT.2010 to OCT.2011.
4. PROJECT : SAUDI KAYAN PP & PH PROJECT – AL-JUBAIL.
End User : SABIC
Position : 1 Year work as Site Engineer / QA-QC Engineer & late 1 year work as QA/QC
Manager (Mechanical)
Period : JULY 2008 to JUNE 2010.
Assigned to work in the capacity of Site Engineer -QA/QC Inspector (Mechanical) and worked the way
to become QA/QC Manager –QA/QC Lead (Mechanical) for day to day management & administration
of procurement phase and construction sites QA/QC works.
• Preparation of QA/QC Program Manuals that includes Procurement Phase, Construction work
procedures, Inspection and Test Plans (ITPs), QA/QC check lists and Forms, Inspection Assignment
Packages and other QA/QC related Test Procedures.
• Assign and monitor QC personnel at various areas of activities prepare and implement QA/QC Plans,
Control Corrective Actions to satisfy acceptance criteria covering, Project specifications and design
drawings.
• Co-ordinate, arrange and attend pre-inspection meeting. Prepare minutes of pre-inspection meetings and
monitor in-process inspections and QC works in co-ordination with vendor inspectors.
• Witness / review reports of Bonding, Survey, Hydro test, Drain Test & Backfilling for U/G RTR Piping
Works, Installation of Drinking water supply line, Vent Pipe line, U/G UPVAC Piping/ G.I VENT Pipe
line, HVAC Inspection works and evaluate to confirm the project specification compliance.
•Witness / review reports of Welding in A/G Piping, Fire Fighting works.
•Witness / review of BPS, WPS&PQR, Test Packages including Punch Lists.
•Reviewing the spool releasing Check Sheet after approval.
•Reviewing the spool releasing Check Sheet after approval.
• Review and verify the finishing works schedule and monitor the architectural finishing .Review check
and edit material request submittal and construction procedures.
• Co-ordinate, arrange and conduct QA/QC meetings and prepare minutes of meetings. Stop the work,
which is not being done in accordance with the project specifications and issue NCR for deficiency, and
take appropriate action to implement QA/QC plans.
•Review and evaluate Lab Reports for construction site activities and prepare Daily, Weekly and Monthly
QA/QC reports.

Last Resume Update October 3, 2018
Address abudabhi, United Arab Emirates
E-mail Locked
Phone Number Locked

Contact Candidate

Login or register as Employer to contact this candidate.